IMG_20190903_094250.jpg
2015-07-23 11.46.00.jpg
Slide11.JPG
Slide2.JPG
Slide25.JPG
Slide8.JPG
IMG_4229.JPG
IMG_20200104_103621.jpg
IMG_20170425_152737.jpg
IMG_20171005_092503.jpg

THOUGHTS

FOR THE DEVELOPERS

BubbleDeck’s flexible slab/column system maximises the owner's investment.

 

BUBLEDECK'S FLEXIBILITY MAXIMISES THE OWNER'S INVESTMENT

BUBBLEDECK offers several advantages in every aspect of the building process - from design to construction, from environmental improvement to economic savings.

BUBBLEDECK combines the advantages of in-situ and prefab - the structural benefits from in-situ with the speed and convenience from the prefab. In addition to this, the concept gives rise to an unprecedented possibility of flexibility.

 
IMG_20170627_131502.jpg

KEY ADVANTAGES

  • Savings in materials (slabs, beams, columns, foundations) are substantial (up to 50%)

  • Transportation costs are substantially reduced

  • Faster construction time; easy carrying out (reduction in erection cycle with 20-40%)

  • Subsequent faster installation of M&E services

  • Buildings are lighter than conventional slab design, therefore, lower overall costing

  • Buildings can be made more flexible, and changes are much less costly

  • Less weather dependent

  • Less Concrete 35%. Saving of up to 40kg CO²/m². 50,000m² building can save up to 2,000 tons of CO².

  • Less workers required. Virtually no carpentry, no rebars beams, less skilled workers needed, less placement of reinforcement.

  • Less transportation of construction materials. Less crowded construction area. Less steel bars, less concrete, virtually no plywood, less false ceiling.

  • All saving effects combined may offer a savings potential of 5-15% of the carcase.

 
IMG_20200730_102715.jpg

ADDITIONAL ASPECTS

  • Improve the safety level of the site condition

  • Reduce risk during erection, due to a reduction in weight as well as the number of crane lifts

  • Reduce building time means less disturbances of surroundings

  • Less emission of noise - in production, transport and assembly

 
sub02.png
100_3537.jpg
IMG_20200104_103641.jpg
WhatsApp Image 2020-07-08 at 15.31.17.jp
2015-07-23 12.27.09.jpg
BD%2520Advantages%2520-%2520Page%25201b_edited_edited.jpg
 

HQ OFFICE   l   No. 59, Jalan Kampung Pandan, Kampung Pandan, 55100 Kuala Lumpur, Wilayah Persekutuan, Malaysia. T: 03-9281 2387

FACTORY   l   Lot 1 & 3, Jalan Zurah 2, Kawsan Perindustrian Rasa, Rasa, Hulu Selangor,  44200 Selangor, Malaysia. T: 012-588 0304 

  • Google Places
  • Facebook

©2020 by BUBBLE DECK CONSTRUCTION SDN BHD. Proudly created with Wix.com