LAUNCHING & INSTALLATION

OF BUBBLEDECK SLAB

The highest IBS Score project in Malaysia certified by CIDB Malaysia.

INSTALLATION: Services
DSC00721.JPG

BUBUBBLEDECK panels are ready at the factory for delivery.

BUBBLEDECK panels are being uploaded onto the trailer

DSC00296_edited.jpg
WhatsApp Image 2020-06-12 at 09.10.35 (1

Temporary props are ready at site to receive the panels

BUBBLEDECK Panels arrived at the site and to be lifted up to the designated floors

WhatsApp Image 2020-01-02 at 10.41.48 AM
WhatsApp Image 2020-06-18 at 09.05.48.jp

THE BUBBLEDECK PANELS ARE TO BE ADJUSTED ONTO THE PRE-DETERMINED POSITIONS.

THE BUBBLEDECK PANELS ARE TO BE SITTED PERPENDICULAR TO TEH TEMPORARY PROPS RUNNERS

SITE%20INSTALLATION_Page_06_edited.jpg
SITE INSTALLATION_Page_07.jpg

Temporary props are seen underneath the panels

Stitching between panels using pre-cut length rebar

SITE%20INSTALLATION_Page_08_edited.jpg
Presentation1_Page_2_edited.jpg

Column capital reinforcement with no bubbles around the column

Formwork edge shuttering before concreting

WhatsApp%20Image%202020-11-07%20at%2011.
WhatsApp%20Image%202020-03-02%20at%208.4

Rebar inspection before casting concrete at site

Powerfloat after concreting at site

SITE%20INSTALLATION_Page_13_edited.jpg
Slide1.JPG

REMINDER FOR PARTIALLY REMOVAL OF PROPS

Seal-up BUBBLEDECK panels groove (optional)

SITE INSTALLATION_Page_15.jpg
Pic 19 RP_2_011_highres.jpg
Structural Designing
WhatsApp%20Image%202020-06-24%20at%2011.50_edited.jpg

BUBBLEDECK TYPE

CALCULATION

INSTALLATION

INSTALLATION: Our Services